Flood Risk Assessment in Northern Ireland
A Flood Risk Assessment (FRA) shows the planning authority and DfI Rivers that your development will be safe from flooding over its lifetime and will not make flooding worse for anyone else. O’Sullivan Environmental prepares site-specific Flood Risk Assessments for planning applications throughout Northern Ireland, from single dwellings and farm buildings to housing, commercial and infrastructure schemes.
We bring the policy review, flood mapping, site visit and historic flood information together in one clear report for your planning application. Where the site or DfI Rivers requires it, we add topographic survey and hydraulic flood modelling, so that the level of assessment matches the level of risk.
What is a Flood Risk Assessment?
A Flood Risk Assessment identifies all sources of flood risk to and from a proposed development and sets out how that risk will be managed and mitigated. The level of detail should be proportionate to the site and the risk. Many FRAs are based on the flood maps, a site visit and historic flood information. Where the site or DfI Rivers requires it, the assessment can also be supported by topographic survey and hydraulic modelling.
A good FRA does two jobs. It gives the decision-maker the evidence needed to apply planning policy, and it gives you a practical understanding of how flooding affects your layout, floor levels, access and drainage. Ideally it should be carried out early, before a layout is fixed, so that design work and planning fees are not spent on a scheme that cannot be approved.
When is a Flood Risk Assessment required in Northern Ireland?
Development in river and coastal flood plains (Policy FLD 1)
Under Policy FLD 1 of Revised Planning Policy Statement 15 (PPS 15) Planning and Flood Risk, development is not permitted within the 1 in 100 year fluvial flood plain (1% annual exceedance probability, AEP) or the 1 in 200 year coastal flood plain (0.5% AEP) unless it is an exception to the policy. For planning purposes these flood plains include an allowance for climate change.
The exceptions include, among others, previously developed land in defended areas, replacement buildings, certain agricultural, transport and utilities development that has to be in the flood plain, water-compatible uses, and outdoor sport, amenity and nature conservation uses. Minor development may also be acceptable. Where the principle of development is accepted, an FRA is required for all proposals, and it must show that:
- all sources of flood risk to and from the development have been identified; and
- there are adequate measures to manage and mitigate any increase in flood risk arising from the development.
FLD 1 also sets out measures that will not be accepted to make development in the flood plain possible. These include new flood defences, flood compensation storage works, and land raising within the undefended fluvial flood plain. Understanding these limits early is often the most valuable part of our advice.
Development near reservoirs (Policy FLD 5)
Policy FLD 5 applies where a site lies within the potential flood inundation area of a controlled reservoir, as shown on Flood Maps NI. New development will only be permitted where there is sufficient assurance about the reservoir’s condition, management and maintenance, and an FRA assesses the downstream flood risk from a controlled release, an uncontrolled release due to failure, and any change in flow paths. DfI Rivers’ Technical Guidance Note 25 explains how it applies this policy.
Surface water and other sources
Outside flood plains, surface water (pluvial) flood risk is dealt with under Policy FLD 3, usually through a Drainage Assessment. Where a site is affected by more than one source of flooding, we can combine the FRA and Drainage Assessment into a single, consistent report.
The planning policy framework
Flood risk policy in Northern Ireland is set by:
- the Strategic Planning Policy Statement for Northern Ireland (SPPS), which sets the regional approach to flood risk;
- Revised PPS 15 Planning and Flood Risk (2014), Policies FLD 1 to FLD 5;
- each council’s Local Development Plan (LDP). Where a council has adopted its Plan Strategy, its own flood risk policies apply to that council area.
Planning authorities consult DfI Rivers, which gives advice on flood risk, reviews FRAs and Drainage Assessments, and publishes technical guidance. This includes its guidance on climate change allowances and Technical Guidance Note 36, which sets out its requirements where a hydraulic model is submitted to support an FRA. We check the current policy position for your council area and make sure the report is set out in the way DfI Rivers expects.

Sources of flooding we assess

- Fluvial (river) flooding: rivers, streams and drains overtopping their banks, including the effect of culvert or bridge blockage.
- Coastal (tidal) flooding: extreme sea levels, surge and wave action, including sea level rise.
- Surface water (pluvial) flooding: intense rainfall that overwhelms drainage and ponds or flows overland.
- Groundwater flooding: rising water tables in susceptible ground.
- Reservoir flooding: failure or controlled release from impounding structures.
- Infrastructure failure: sewers, water mains and drainage systems.
What our Flood Risk Assessments include
Every FRA is scoped to the site and the level of risk, but it will typically cover:
- a review of the proposal against Revised PPS 15, the SPPS and any relevant policies in the council’s adopted Plan Strategy;
- a review of DfI Rivers’ Flood Maps NI (present day and climate change layers) and any other DfI Rivers information for the site;
- a site visit to confirm watercourses, structures, flow paths and existing drainage;
- historic flood information for the site and the surrounding area;
- identification of all sources of flood risk to and from the development;
- surface water and drainage considerations, including SuDS and discharge arrangements (with a Schedule 6 consent application where discharge is to a watercourse);
- mitigation, such as recommended finished floor levels, safe access and egress, flood resilience measures and, where appropriate, a flood management and evacuation plan;
- a clear report for the planning application, with conclusions against the relevant policy tests.
Where the site or DfI Rivers requires it, we can also provide:
- topographic survey, including drone LiDAR or photogrammetry survey using our own equipment, to establish ground levels accurately;
- hydrological analysis and 1D/2D hydraulic modelling of the watercourse using InfoWorks ICM or HEC-RAS.
Hydraulic flood modelling

Many FRAs do not need a hydraulic model. Where the site or DfI Rivers requires it, for example where the flood extent or flood levels need to be defined more precisely than the strategic flood maps allow, we can build a site-specific 1D/2D hydraulic model of the watercourse using InfoWorks ICM or HEC-RAS.
Where modelling is needed, it can be used to:
- define design flood levels and extents across the site, with climate change allowances in line with current DfI guidance;
- set finished floor levels and confirm safe access and egress;
- test the effect of culvert or bridge blockage;
- show whether a proposal would increase flood risk elsewhere;
- support a challenge to Flood Maps NI where the mapped extent does not reflect conditions on the ground.
DfI Rivers’ Technical Guidance Note 36, Flood Modelling Requirements to Support a Flood Risk Assessment, sets out the information and standards DfI Rivers expects when a hydraulic model is submitted with an FRA. We prepare our models and model reporting with that guidance in mind.
A model is only as good as the ground levels behind it. Where a model needs more detailed levels than are already available, we can capture them across the site and its surroundings with our own drone survey equipment and feed them directly into the model.
Challenging the flood maps
Flood Maps NI are produced from strategic models. DfI describes some layers, particularly surface water, as indicative rather than precise. Where there is good reason to believe the mapped flood extent does not reflect conditions on your site, a site-specific hydraulic model based on accurate topographical survey can be used to challenge it. If DfI Rivers accepts the challenge, it informs the planning authority. The public maps are not updated piecemeal, so the published outline may not change straight away.
Developments we assess
We prepare FRAs for:
- single dwellings, replacement dwellings and extensions;
- residential developments of all sizes;
- agricultural buildings and farm infrastructure;
- commercial and industrial development;
- sports grounds and recreational facilities;
- energy and infrastructure projects, including battery energy storage (BESS);
- bridges, culverts and works near watercourses.

Frequently asked questions
How do I know if my site needs a Flood Risk Assessment?
Check the site on DfI’s Flood Maps NI. If it lies within or close to a mapped river, coastal or reservoir flood extent, or the council or DfI Rivers has asked for one, you are likely to need an FRA. If you are unsure, send us the site location and we will advise.
What is the difference between a Flood Risk Assessment and a Drainage Assessment?
An FRA mainly addresses river, coastal and reservoir flooding under Policies FLD 1 and FLD 5. A Drainage Assessment addresses surface water flood risk and site drainage under Policy FLD 3. Many sites need elements of both.
Can I build in a flood plain in Northern Ireland?
Only if the proposal is an exception to Policy FLD 1 (or meets the equivalent policy in your council’s adopted Plan Strategy), and a Flood Risk Assessment shows the risk can be managed without increasing flooding elsewhere.
Do all Flood Risk Assessments need flood modelling or a survey?
No. Many FRAs can be completed using DfI Rivers’ Flood Maps NI, historic flood information, a site visit and any existing site levels. A topographic survey or hydraulic model is only needed where the site or DfI Rivers requires it, for example where the flood extent or levels need to be defined more precisely, or where the mapped flood extent is being challenged. We will tell you at the outset whether either is likely to be needed, and we keep the assessment proportionate to the risk.
What modelling software do you use?
Where an FRA needs hydraulic modelling, we use InfoWorks ICM or HEC-RAS, choosing the one that suits the watercourse and the questions the assessment needs to answer.
Get advice on your site
Send us your site location and a brief description of the proposal and we will advise on the scope of assessment needed.
Call 07734 366999 | Email m.osullivan@osullivanenvironmental.co.uk | Contact us